The dedicated Northern & Southern California field execution subcontractor for national ITAD primes, enterprise colos, and hyperscalers. Certified electrical safe-off, ServerLIFT de-racking, and serialized asset custody under a single COI.
Full legal authority to de-energize and disconnect overhead Starline/Eaton tap-off boxes, PDU whips, and breaker panel LOTO.
Pre-formatted certificates of insurance ready for same-day addition of national prime contractors and colocation facilities as named insured.
7-year background-checked field technicians experienced in Tier 3/4 colocation operating procedures and strict facility protocols.
Pre-scan barcode verification for every chassis, switch, and blade against master manifests prior to palletizing and tamper-evident sealing.
We eliminate out-of-state travel overhead and multi-trade coordination delays with our dedicated California crews.
High-density barcode scanning of chassis, serials, asset tags, and drives matched against master client manifests before rack unbolting.
Damage-free un-racking of heavy 1U–8U compute nodes, GPU clusters, and high-density SAN storage arrays using precision server lifts.
C-10 certified disconnection of overhead busway tap-off boxes (Starline, Eaton, Schneider), PDU whips, and breaker panel lockout/tagout.
Systematic removal of Cat6A copper, single-mode/multimode MPO fiber trunks, wire basket demo, and subfloor anchor grinding.
Dense foam cornering, steel/poly strapping, heavy-gauge stretch wrap, and tamper-evident security tape ready for dedicated freight carriers.